Vista aerea dell'azienda Cavagna Pressofusioni a Brescia

The company was first granted the ISO certification in 1996. Afterwards, we upgraded it to ISO 9001:2008, and finally, in 2018, we obtained the ISO 9001:2015 certification.
As part of our mission to protect our environment, in 2020 Cavagna also obtained the ISO 14001:2015 Environmental Certification.

Cavagna Pressofusioni

Our company has been operating in the zinc alloy die-casting sector since 1993.
Our production plant is divided into two units- one covering a 12,000-sq.m area, and the other one is a well-structured and modern 3,500-sq.m building, with safe and comfortable working environments. Our corporate policy is markedly oriented to meet customers' needs and requirements as well as to respect the environment.

Fonderia Cavagna Pressofusioni a Brescia
Logo Cavagna Pressofusioni

Our history

Timeline

1993

Cavagna Pressofusioni is established

1995

An X-ray machine is introduced: a Gilardoni CHF 200S. Cavagna Sistemi is established that very same year

1996

The ISO 9002:1994 certification is obtained.

1997

Cavagna Pressofusioni is constantly expanding and needs new space and equipment. We started to renovate the new premises.

1998

A new press is introduced: an Idra OLZ/40.

1999

Works on the new premises are completed and production begins in December. Another press is introduced the same year: a COLOSIO PFZ 200 + a Fondarex vacuum system.

2000

A sandblasting plant is replaced with three more modern machines:
- a Tosca TG13,
- a Tosca continuous flow TSCHF 500, and
- a Corundum sandblasting blower.

2001

Three new presses comprising a cutting robotic workstation and vacuum systems are introduced.

2002

The mechanical workshop received:
- a Sigma Mission 2 milling machine (3 axes), and
- a Rovella EDM - CDM.

2002

Upgrade to ISO 9001:2000 certification.

2002

The company to manufacture, mould and process plastic materials is established. And so, Bonardi S.r.l. was founded.

2002 - 2003 - 2006

Three new presses comprising a cutting robotic workstation and a Mitutoyo Crysta Apex 776 CMM are introduced.

2012

Two IDRA 40 presses are replaced with
- a Colosio PFZ 200, and
- a Colosio PFZ 250
Both featuring a robotic workstation, cutting and Green Line, an low energy consumption.

2013

The Finishing Department is upgraded with the introduction of a machine designed by Cavagna Pressofusioni for separating burrs from finished parts.
Bonardi S.r.l. becomes Cavagna Polimeri.

2014

The foundry is upgraded with the introduction of a new automated workstation.

2015

Like in the previous year, the foundry is further upgraded when another 2 presses became fully automated.

2018

The ISO 9001:2015 certification is upgraded. In the same year, a machine for checking 100% of the parts made was introduced.

2018

Handover to a new generation.

2019

A year of great changes. After the changeover to the new generation, the following are introduced:
- 2 automated foundry islands.
- 2 automated machining islands.
- 1 CMZ automatic lathe with milling turret and CAM.
- 1 milling machine with 5 axis Emco Famup Maxxmill 630
- 1 Cobot Sawyer robot.

2019

The two companies 'Polimeri' and 'Sistemi' merge into Cavagna Pressofusioni S.r.l. A single production complex is thus created.

2020

The ISO 14001:2015 Environmental Certification is obtained.

2020

Another machine for checking 100% of parts was added as well as a new ABB Yumi robot.

TODAY

We are currently evaluating adding a new press and a new sandblasting system.

What do we offer?

The Closed Project! A full and comprehensive service to our customers
pieces moulded per year
0 million
of raw material used
0 tonnes/month
production lines
1
of experience
0 years

Work with us

Last revised on 12 June 2025

2026 © Cavagna pressofusioni S.r.l. a Socio Unico — C.F. & P.IVA 01736350982
Dati societari ed informazioni art. 25 c. 12 d.l. 18 ottobre 2012 n. 179.